Open Items
Unit 4B — drywall gap at window header, northeast corner
📷
📷
+
Lobby — grout haze on floor tile, entire entry zone
Stairwell B — handrail bracket loose at landing 3
Unit 2A kitchen — cabinet door alignment off by ~4mm
Resolved
✓
Rooftop — waterproofing membrane edge sealed
✓
Unit 3C — HVAC register cover missing, replaced
Tue Jun 24 · 7:14 AM
Framing crew completed north wall rough-in on floors 3–5. Electrical rough-in started in Units 4A–4D. Inspector signed off on structural steel connections. Minor delay on stairwell B handrail delivery — parts expected Thursday AM.
☀️ 81°F
💨 12 mph wind
Framing ×6
Electrical ×3
Inspection ×1
Mon Jun 23 · 6:58 AM
Concrete pour on 6th floor deck completed by 10:30 AM. Cure blankets placed. Tile crew finished lobby install — grout haze issue noted, logged as punch item. Safety walkthrough completed, one corrective item (stairwell rail).
⛅ 74°F
Concrete ×8
Tile ×4
Safety ×1
On Site Today
14 workers
Check-in Status
DM
Diego Morales
Foreman
Checked in 6:48 AM
9.5
hrs today
RE
Rosa Espinoza
Lead Carpenter
Checked in 7:02 AM
8.0
hrs today
MT
Marco Torres
Ironworker
Checked in 7:10 AM
8.5
hrs today
KH
Kevin Huang
Tile Setter
Checked in 7:31 AM
7.5
hrs today
TN
Thanh Nguyen
HVAC Tech
Not checked in — called out
0.0
hrs today
Safety Log
14
Days Incident-Free
2
Open Hazards
1
Near-Miss This Month
Stairwell B — unsecured rebar at landing 3
Hazard
Floor 5 — open penetration near elevator shaft, no barrier
Hazard
Lobby — wet concrete spill, slip risk — cleaned and barriered
Cleared
Unit 3A — worker nearly struck by falling drywall scrap from above
Near-Miss
Change Orders
$48,200
Pending Approval
$112,500
Approved This Phase
CO-014 — Structural reinforcement, floor 4 beam
+$32,400
Unforeseen condition: existing concrete slab below spec. Engineer-directed addition of 3 steel beams at column lines B4, C4, D4 per revised structural drawings.
Awaiting Approval
CO-013 — Upgrade lobby tile to porcelain pavers
+$15,800
Owner-directed substitution from ceramic to large-format porcelain pavers (24×48) with additional waterproofing membrane.
Awaiting Approval
CO-012 — Additional MEP rough-in, Units 5A–5D
+$28,700
Design revision added two additional circuits and hot/cold rough-in per revised unit layouts.
Approved
Built for Construction & Trades
One app that protects your margins, your crew, and your reputation on every job.
BuildLog gives PMs, foremen, and GCs a single field tool for punch lists, daily documentation, safety logging, and change order tracking — from any phone, even without signal. Everything is timestamped, assigned, and defensible.
Pain Points This Eliminates
Change order disputes that cost you money
Without a paper trail, owners push back or claim approval never happened. The Change Orders tab timestamps every submission, captures scope, and tracks approval status — legal defensibility on every dollar.
Safety incidents with no documentation
OSHA violations and liability claims hinge on what you can prove you knew and when. The Safety Log creates a timestamped, attributed record of every hazard, near-miss, and corrective action — your first line of defense.
Punch list items falling through the cracks at handoff
Paper lists get lost, photos don't attach, and the GC never has the current version. Every item here is assigned, photo-documented, and severity-flagged — so handoff is clean and warranty disputes are rare.
No visibility into who's actually on site
Subcontractor no-shows cascade into schedule delays with no warning. Crew check-in status and flagged absences mean you know by 8 AM whether you have a coverage problem — before it becomes a delay claim.
No internet kills documentation mid-job
Steel framing, concrete floors, and remote sites all kill cell signal. BuildLog is offline-first — all logs, photos, and punch updates capture locally and sync the moment signal returns.
Daily reports written from memory at end of week
Foremen reconstructing logs on Friday miss details that matter in disputes. The Daily Log captures crew counts, weather, decisions, and subcontractor activity in real time — searchable and exportable.
The Numbers
3h
Saved per PM per week on paperwork & reporting
68%
Fewer punch items missed at owner handoff
$0
App store fees — installs via link on any phone
1 day
Crew onboarding — no training required
What's Included
Punch list with photo documentation, severity flags & assignments
Daily log with crew count, weather, and timestamped entries
Safety log — hazards, near-misses, incidents with timestamps
Change order tracker with scope, amount, and approval status
Crew check-in status and hours per trade per day
Full offline functionality — works anywhere on site
Custom-branded with your company name & colors
PDF export for owner and GC handoff packages
Ready to see it with your project?
We'll configure a live version with your branding and a real job in 24 hours — free demo, no commitment.